The installed equipment needs electrical power. The supplies to some churches may not be able to provide the extra load placed on them by this equipment, and in these cases new supply lines will be run to the church.

The need for this will be determined during the design process. It could be that the church as whole could benefit from a new power supply connection and this can be taken into account in the design.

In addition to providing new power connections to the church, it may be necessary to provide a cable to connect the communications equipment to the national network.